Scope
Chapter “The admissibility frontier”, section “Observers, horizons and outgoing channels”. This is assertion 1 of 4 in that section.
Expanded claim page · assertion 1 of 4
Works after a named field, coefficient, boundary condition or control is supplied. joins several typed results while letting the weakest edge set the claim.
Exact assertion
This section marks a live integration boundary. An accelerated detector closes over a field state, worldline, switching and transition record; its thermal detailed-balance ratio does not mean the global Minkowski vacuum has changed.
The construction is admitted only after the named additional input is supplied. The page records the dependency instead of hiding it inside the conclusion.
Chapter “The admissibility frontier”, section “Observers, horizons and outgoing channels”. This is assertion 1 of 4 in that section.
Identify the named external input and verify that the construction follows after it is supplied.
joins several typed results while letting the weakest edge set the claim.
Show that the named input is inconsistent, insufficient, unavailable, or fails to imply the claimed construction.
Source map